top of page

CertaOne Medium
Prefabricated Data Centre Solution

Supports IT loads of up to 270 kW 

Traditional data centres require long construction and commissioning period and have high energy consumption and significant initial investment. To address these issues CertaOne  has sourced the C1 Medium outdoor data centre solution which comprises a highly integrated power system, environmental monitoring, cooling systems, racks, cabling, fire control, security and other infrastructure facilities. The system supports IT loads of up to 270kW. Fast deployment with staged scenarios are possible. It offers IP55 external protection level, 9 degree anti-seismic intensity performance and is operable from -40°C to +55°C. Equipped with CertaOne Eco management system which allows centralised remote monitoring and unified management.

bottom of page